3.18 Installation Checklist

 System is located within the specified operating environment and the
components have been placed as specified. Refer to Sections 2.0 and 3.1.
 System is properly grounded according to local and national codes.
 Primary power is connected to the System according to local and national codes.
 The voltage selection jumper matches the supplied voltage. Refer to Section 3.4.
 Gasses are connected properly. Fittings have been checked for leaks.
 All System components are connected properly. Refer to Section 3.2.
 Torch assembly is securely mounted and consumables are installed in the torch.
Refer to Sections 3.11 and 3.12.
 All required software is installed and commissioned. Refer to Section 3.16.
 Cooling system is filled with torch coolant. Reservoir cap is installed.
Fittings have been checked for leaks. Refer to Section 3.17.
 All access panels and doors are closed and secured.
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
Page 48 of 118
BK8053-000107 Rev A.01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents