ZERO__________________
Then slowly rotate the ENTRY knob in the reverse (Die
Gap Closed) direction while watching the Valve current
indicator until the Valve current reaches Zero or the Die
Gap indicator moves slightly.
Now turn the ENTRY knob in the original direction until the
motion just stops and the Valve current indicator shows
slightly increasing current. The Die Gap has just reached
its closed position.
Push set. Install a dial indicator to indicate Die Gap position.
Set the dial indicator to Zero.
SPAN__________________
The LCD display has changed to indicate SPAN. "
1-38
" Span is the maximum Die Gap opening and is set,
using the dial indicator, to the die gap tooling designers
specified opening.
Open the die gap by rotating the ENTRY knob. Continue
until the required die gap has been reached. Press Set.
UNITS and Full stroke______________
Press Set or Cursor Key (downward) at Zero/Span Span.
Cursor moves to the Core Stroke Unit – either % or mm. %
will give a die gap opening percentage reference where
100% equals the distance Stroke. mm will give the die gap
opening directly in mm based upon the SPAN setting.
Select the desired units using the ENTRY Knob and press
Set. The value of Full stroke is set as DCDT / SSI full
stroke length. (ex, ±10V=25.4 mm, Full stroke set to 25.4).
The Stroke will automatically calculate from Zero/Span
setting. Which mean 100%=Stroke (mm) showing die gap
opening reference on any display.
Use the ENTRY KNOB to indicate the Stroke in mm.
Figure 1-39
Move to Back "
© MOOG 2010
This document is subject to MOOG INTELLECTUAL AND PROPRIETARY INFORMATION LEGEND . The details are on page II.
" and press set. The Setup Display is now shown.
Figure 1-38 Die Gap Span Setting
Figure
37
Figure 1-39 Back
MRJ04410
Need help?
Do you have a question about the DigiPack Ⅱ and is the answer not in the manual?
Questions and answers
How..to set up the..Digi pack 2 on machine
To set up the Moog DigiPack II on a machine, follow these key steps:
1. Installer Requirements: The installer must be familiar with electrical wiring, hydraulic plumbing, basic metal work, and have some understanding of the blow molding process. Use of test instruments like a digital voltmeter is also required.
2. Mechanical Installation:
- Install and adjust tooling and die gap actuators.
- Mount the servovalve and manifold.
- Install the hydraulic cylinder and ensure it meets customer specifications.
- Measure and set accumulator position.
- Ensure proper filtration and install filters.
- Connect the hydraulic power supply and follow startup instructions.
- Implement contamination control.
3. Electrical Installation: Follow the manual's guidance for electrical connections.
4. Software Update (if needed):
- Power off DigiPack II and remove the SD card.
- Save the “DIGIPK2.FWM” file to the SD card using a PC.
- Reinsert the SD card and power on the unit.
- Press “X10” and “Cursor Down” keys simultaneously during startup.
- Wait for the “Updating firmware……” message.
- Confirm update by checking the software version on the startup display.
5. Calibration and Setup:
- Set accumulator working stroke, shot size, and end position.
- Interface DigiPack II with the machine’s PLC for motion control.
Proper installation following the manual ensures reliable long-term operation.
This answer is automatically generated
The shot size is to short and the Digi pack to is not in command..
If the shot size is too short and the Moog DigiPack II is not functioning properly, turn the Entry Knob clockwise to increase the Shot Size value on the LCD display. Then press the Set button to make the change permanent.
This answer is automatically generated