Digipackⅱ Manual, Installation And Maintenance; Change From J141-214 - Moog DigiPack Ⅱ Installation, Maintenance And User Manual

Table of Contents

Advertisement

DigiPackⅡ Manual, Installation and
1.

1-1. Change from J141-214

The basic specification of DigiPackⅡ(J141-214A) is equivalent to conventional
J141-214.
Refer to the following table for a changed part.
Modify Items
1 Timer Backup
Production
2
quantity man-
agement
3 DCDT Power
© MOOG 2010
This document is subject to MOOG INTELLECTUAL AND PROPRIETARY INFORMATION LEGEND . The details are on page II.
J141-214
Button cell.
Ultra capacitor
Retention time is
Exchange is unneces-
about five years and
sary although retention
needs to be ex-
time is about three
changed.
weeks.
Charge to a capacitor is
performed by carrying
out a turning on elec-
tricity start.
with functional
Function deleted.
±15V
±10Vref
The power supply for
DCDT was changed into
the stabilized power
supply of ±10V.
Maintenance
J141-214A
When time is not correct by no turning
on electricity for a long period of time,
the right time is set up on F2 screen.
Due to battery exchange was not
needs, the necessity for maintenances
other than failure is not need.
A time setup was added to the portion
which the screen (F2) of production
control deleted.
It changed for stabilization of the
power supply for sensors of a core
position.
Moreover, it was referred to as ±10V
so that it might be united with an input
range.
The method of wiring changes.
Please refer to
nections
1
Comment
Figure 1-19 TB-1 Con-
in Page 21.
MRJ04410

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DigiPack Ⅱ and is the answer not in the manual?

Questions and answers

Elvis
April 14, 2025

How..to set up the..Digi pack 2 on machine

1 comments:
Mr. Anderson
April 14, 2025

To set up the Moog DigiPack II on a machine, follow these key steps:

1. Installer Requirements: The installer must be familiar with electrical wiring, hydraulic plumbing, basic metal work, and have some understanding of the blow molding process. Use of test instruments like a digital voltmeter is also required.

2. Mechanical Installation:
- Install and adjust tooling and die gap actuators.
- Mount the servovalve and manifold.
- Install the hydraulic cylinder and ensure it meets customer specifications.
- Measure and set accumulator position.
- Ensure proper filtration and install filters.
- Connect the hydraulic power supply and follow startup instructions.
- Implement contamination control.

3. Electrical Installation: Follow the manual's guidance for electrical connections.

4. Software Update (if needed):
- Power off DigiPack II and remove the SD card.
- Save the “DIGIPK2.FWM” file to the SD card using a PC.
- Reinsert the SD card and power on the unit.
- Press “X10” and “Cursor Down” keys simultaneously during startup.
- Wait for the “Updating firmware……” message.
- Confirm update by checking the software version on the startup display.

5. Calibration and Setup:
- Set accumulator working stroke, shot size, and end position.
- Interface DigiPack II with the machine’s PLC for motion control.

Proper installation following the manual ensures reliable long-term operation.

This answer is automatically generated

Elvis
April 14, 2025

The shot size is to short and the Digi pack to is not in command..

1 comments:
Mr. Anderson
April 14, 2025

If the shot size is too short and the Moog DigiPack II is not functioning properly, turn the Entry Knob clockwise to increase the Shot Size value on the LCD display. Then press the Set button to make the change permanent.

This answer is automatically generated

Table of Contents

Save PDF