Figure 1-31 Machine Setting Display (F4+Set); Figure 1-32 Machine Setting Functions; Figure 1-39 Back - Moog DigiPack Ⅱ Installation, Maintenance And User Manual

Table of Contents

Advertisement

Figure 1-32
"
" defines all of the settings.
Function
Profile interpolation
Language
Back light (min)
LCD
Memory
Above 5 parameters are updated always
Machine Type
Servovalve type
Valve current (mA)
Open command
Core sensor
Output mode select
SSI ratio (um)
SSI data code type
SSI bits (bit)
SSI clock (kHz)
SSI position offset (mm)
Pulse out rate 1 (um)
Pulse out rate 2 (pulse)
Pulse out polarity
Above 14 parameters are update due to press "Reset" switch
© MOOG 2010
This document is subject to MOOG INTELLECTUAL AND PROPRIETARY INFORMATION LEGEND . The details are on page II.

Figure 1-31 Machine setting display (F4+Set)

Setting
Straight
English
5
Contrast. Knob CCW : dark, Knob CW : bright
ON
Continuous
MFB
10
20
Disable
DCDT
EFB/MFB
If select DCDT sensor, do not
set these parameter
1 – 32767
1 – 32767
Normal

Figure 1-32 Machine setting Functions

Setting
Spline
Chinese
10
30
OFF
Accumulator
EFB
50
100
-- (not use EFB mode)
Enable
SSI
Pulse
0.1 to 3276.7
Gray or Binary
12+12 or 12+13
160/320/640/1280
-327.68 to 327.67
Press "Zero" to set the current
position to "0"V feedback.
Reverse
30
Japanese
-- (no screen saver)
MRJ04410

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DigiPack Ⅱ and is the answer not in the manual?

Questions and answers

Elvis
April 14, 2025

How..to set up the..Digi pack 2 on machine

1 comments:
Mr. Anderson
April 14, 2025

To set up the Moog DigiPack II on a machine, follow these key steps:

1. Installer Requirements: The installer must be familiar with electrical wiring, hydraulic plumbing, basic metal work, and have some understanding of the blow molding process. Use of test instruments like a digital voltmeter is also required.

2. Mechanical Installation:
- Install and adjust tooling and die gap actuators.
- Mount the servovalve and manifold.
- Install the hydraulic cylinder and ensure it meets customer specifications.
- Measure and set accumulator position.
- Ensure proper filtration and install filters.
- Connect the hydraulic power supply and follow startup instructions.
- Implement contamination control.

3. Electrical Installation: Follow the manual's guidance for electrical connections.

4. Software Update (if needed):
- Power off DigiPack II and remove the SD card.
- Save the “DIGIPK2.FWM” file to the SD card using a PC.
- Reinsert the SD card and power on the unit.
- Press “X10” and “Cursor Down” keys simultaneously during startup.
- Wait for the “Updating firmware……” message.
- Confirm update by checking the software version on the startup display.

5. Calibration and Setup:
- Set accumulator working stroke, shot size, and end position.
- Interface DigiPack II with the machine’s PLC for motion control.

Proper installation following the manual ensures reliable long-term operation.

This answer is automatically generated

Elvis
April 14, 2025

The shot size is to short and the Digi pack to is not in command..

1 comments:
Mr. Anderson
April 14, 2025

If the shot size is too short and the Moog DigiPack II is not functioning properly, turn the Entry Knob clockwise to increase the Shot Size value on the LCD display. Then press the Set button to make the change permanent.

This answer is automatically generated

Table of Contents

Save PDF