Conduit; Commissioning The Gauge - Vega FiberFlex LFXG-H Operating Instructions Manual

Detector with gen2000 electronics for level measurement
Table of Contents

Advertisement

Conduit

Conduit runs must be continuous and you must provide protection to
prevent conduit moisture condensation from dripping into any housings or
junction boxes. Use sealant in the conduit, or arrange the runs so they are
below the entries to the housings and use weep holes where permitted.
You must use a conduit seal-off near the housing when located in a
hazardous area. Distance must comply with local code.
If you use only one conduit hub, plug the other one to prevent dirt and moisture
from entering.

Commissioning the gauge

Depending on the source holder's type, the process of commissioning the
gauge can include:
• Taking appropriate radiation field tests
• Checking the pre-programmed setup parameters
• Calibrating on process
• Verifying the working of the gauge
You must remove the source holder lock or shield the first time the gauge
takes measurements in the field. Only persons with a specific license from
the U.S. NRC, Agreement State, or other nuclear regulatory body may
remove the source holder lock.
Note: Users outside the U.S. must comply with the appropriate
Note: See the Radiation Safety for U.S. General and Specific
LFXG-H Installation and Operation Guide
nuclear regulatory body's regulations in matters pertaining to
licensing and handling the equipment.
Licensees, Canadian and International Users Manual and the
Radiation Safety Manual Addendum of Reference Information
CD that came with the source holder and the appropriate
current regulations for details.
Installation
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents