Starting Up And Shutting Down The System; When The Power On/Off Sequences Are Interlocked; Starting Up The System - FujiFilm FCR XG-1 Operation Manual

Hide thumbs Also See for FCR XG-1:
Table of Contents

Advertisement

Operations
2.1

Starting Up and Shutting Down the System

Z
How to start up and shut down this system will differ whether the power to the
CR–IR346CL and CR-IR346RU is interlocked with each other or not.

2.1.1 When the Power ON/OFF Sequences are Interlocked

Starting Up the System

1 Start up the CR Console. (For detailed operation procedures, see the [CR Console Opera-
tion Manual].)
The CR Console application software will start up.
[ Fig. 2.1 ] CR Console Startup
2-2
Power ON/OFF
switch
010-021-20 09.2001

Advertisement

Table of Contents
loading

Table of Contents