Vanair Air N Arc All-in-One Power Systems 300 Operations Manual & Parts List page 58

Table of Contents

Advertisement

SECTION 4: INSTALLATION
D
E
F
A
B
C
KEY
A
BASE COVER
B
TRUSS SCREW 1/4 (x6)
C
NYLON FLAT WASHER 1/4 (x6)
D
MOUNTING NUT 1/2 (x6)
E
LOCK WASHER 1/2 (x4)
CAUTION
Lift the machine package in accordance
within the safety guidelines given in
Section 1.7.1, Falling Unit Can Cause
Injury.
PAGE - 40
J
F
G
H
DESCRIPTION
Figure 4-4: Removing Package from Crate Mounting
090010-OP_r0
®
AIR N ARC
300 SERIES ALL-IN-ONE POWER SYSTEM
J
H
KEY
DESCRIPTION
F
WASHER 1/2 (x8)
G
MOUNTING BOLT 1/2 (x4)
H
SHIPPING CRATE SKID PLATFORM
J
MACHINE PACKAGE
K
BASE COVER (WITH CUTOUT)
2. To unbolt the unit from the skid, remove the
mounting nuts [D], lock washers [E], washers
[F] and mounting bolts [G] securing the
package unit [J] to the shipping crate.
3. Place the unit in a preliminary position on the
service body so that the front panel access
and hood opening (front) side is easily
accessible, and the control trunk line and all
other connections will reach the unit. Refer
to Figure 4-5 for lifting bail location.
4. Route the control trunk-line through the
grommeted opening. Connect the ½" air line
via the JIC fitting on the end of the air tank,
and connect and secure the weather proof
connectors. The plugs are all differentiated
to ensure that they cannot be mis-
connected.
5. Connect and clamp the fuel line to the inline
fuel filter located on the engine near the left
D
E
F
K
F
G
B
C
®

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents