Unpacking And Handling Of The Appliance; Installation And Connection To The Electrical Network - Fiorenzato ALLGround Installation, Use And Maintenance Manual

Hide thumbs Also See for ALLGround:
Table of Contents

Advertisement

Available languages

Available languages

4.3 Unpacking and handling of the appliance

After opening the packaging, carefully check that the appliance is intact and that there
are no damaged parts.
Open the packaging near the installation point, ensuring there is sufficient space to
handle the appliance safely.
Remove the appliance from the packaging, gripping it firmly and safely.
Place the grinder on the work surface.
ATTENTION! Be careful when handling or moving the appliance. Due to its
weight (9 kg) and the rounded shape of the machine body, there is a risk that
it may slip from your grip.

4.4 Installation and connection to the electrical network

To complete the installation and start using your new coffee grinder, simply connect the
plug to the power outlet (Fig. 9).
If it is necessary to use power adapters, multiple sockets or extensions, it is
essential to use products that comply with the certification standards in force
in the country of use.
If present, set the protection magnetothermic switch located upstream of the power
socket to the "ON" position (Fig. 10).
Turn the machine power switch to "ON" (Fig. 11).
Fig. 9
At this point the coffee grinder is powered and ready to be used.
Fiorenzato | Cod. AllGround_001 Ed. 01/2021
ON
OFF
Fig. 10
EN
Fig. 11
59 / 116

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents