Yamaha T8 Rigging Manual page 445

Hide thumbs Also See for T8:
Table of Contents

Advertisement

10) Move the remote control lever between
forward and reverse positions at the
first station several times and place the
shift rack in the junction unit in neutral.
Check if the grooves on the rack and
cable end are offset each other.
Repeat the check at the second station.
11) If still offset, repeat the above steps 4)
to 10) until the offset is eliminated.
12) Install the cable clamp, move the
remote control lever between forward
and reverse positions at the first station
several times and check that the volt-
age is within the specification.
13) Install the clamp covers and the side
cover.
10A-28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents