Yamaha T8 Rigging Manual page 226

Hide thumbs Also See for T8:
Table of Contents

Advertisement

Outboard Rigging Guide - 2001
f. Hold the back plate firmly with the five
screws.
3. Securing and Installing Accessories on the
Remote Control Box.
a. Set the remote control box so it's
mounting holes align with the mounting
holes in the base.
1 Mounting Hole
705 Flush Side Mount Remote Control Ass'y.
b. Tightly bolt the base to the remote control
box.
Tightening Torque:
30 ~ 45 cm-kg
1 Cover
2 Base
c. Install the remote control box to the
mounting plate (hull) with screws and
nuts. When the mounting plate thickness
is less than 20mm, use the screws, nuts,
and washers. When 20mm or more, use
the wooden screws.
Tightening Torque:
50 ~ 80 cm-kg
NOTE: When the mounting plate (hull) is more
than 30mm, the installation of the remote control
box is impossible.
1 Screw
2 Plain Washer
4-39
3 Hole
5 Washer
4 Screw
3 Nut
4 Wooden Screw

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents