Case CX75SR Operator's Manual page 79

Hide thumbs Also See for CX75SR:
Table of Contents

Advertisement

C
CT02D066A
6. Make sure that the switch (1) located on the
left-hand arm is in the desired position.
1
CT02C228
7. Operate the Option Pedal. See Option Pedal in
the Controls/Instruments/Accessories section.
CT02C235
8. When removing the demolition grab, turn the
supply valves to the closed position (-), and plug
them.
6-34551NA
CHAPTER 4 - OPERATING INSTRUCTIONS
Figure 60
Figure 61
Figure 62
Issued 8-04 Bur
CT02C124
9. Toggle the switch to the bucket position then
bring the flow selector valve into position (B).
CT02C236
Figure 63
Figure 64
4-19