11. See Operating in water if the machine will be
standing in water during use.
12. See Transporting the machine when driving the
machine onto a trailer.
13. See Handling the machine when it is necessary
to lift the machine.
14. In some configurations, the working range of the
attachment allows the tool to interfere with the
machine. Always maintain a safe minimum
distance between the tool and the machine.
15. Never use the attachment for sweeping the
ground to level out r ubble or push objects
(transversal stress on the attachment).
16. Avoid running the engine in a confined space. If
there is no alternative, proper ventilation must be
provided at all times.
17. Dust, smoke or mist can reduce visibility and
cause an accident. Reduce speed or come to a
complete halt until visibility has improved.
18. In the event of an operation problem or failure,
move the machine to a safe place, lower the
attachment to the ground, shut down the engine
and remove the starter switch key. Locate the
problem, report it if necessary and take the
necessary steps to warn others not to attempt to
operate the machine.
19. Do not stop the engine without taking prevailing
weather conditions into consideration. See
Stopping the engine.
20. See Parking the machine when you have to park
the machine.
21. Whenever load handling operations are to be
carried out, it is imperative to adhere strictly to
the instructions given in this manual and local
legislation. See Load handling.
22. When travelling with the hydraulic breaker
(optional), make sure it is not too close and not
pointing in the direction of the cab.

RUN-IN PERIOD

Your machine will last longer and will give better and
more economical performance if you pay particular
attention to the engine during the first twenty hours of
operation.
During this period:
Warm up the engine before using it under load.
Do not run the engine for a long period at idle speed.
Frequently check the instruments on the instrument
panel.
Check the oil levels and coolant solution level
frequently.
4-4
CHAPTER 4 - OPERATING INSTRUCTIONS
During the run-in period, the following checks and
servicing operations should be carried out in addition
to those specified in the service schedule:

AFTER THE FIRST 50 HOURS

Replace the pilot circuit filter and the return filter. See
Hydraulic system in the Lubrication/Filters/Fluids
section.
Check the pad screws are tightened to the correct
torque. See Tracks in the Maintenance/Adjustments
section.
Check all nuts and screws are tightened to the
correct torque. See Hardware torque inspection in
the Maintenance/Adjustments section.

AFTER THE FIRST 250 HOURS

Change the oil in the travel reduction gears. See
Tr a v e l
r e d u c t i o n
Lubrication/Filters/Fluids section.
CX135SR - Change the oil in the swing reduction
g e a r. S e e S w i n g r e d u c t i o n g e a r i n t h e
Lubrication/Filters/Fluids section.

STARTING THE ENGINE

NOTE: If the machine has been out of use for some
time, see Starting up after storage in the Storage
section.
NOTE: If you need to start the engine using a
booster battery, see Connecting a booster battery in
the Electrical system section.
1. Take up position correctly in the operator's seat
with the seat belt correctly fastened. See
O p e r a t o r ' s
Controls/Instruments/Accessories section.
2. Make sure that the control function cancellation
lever is in the raised position.
Sound the horn before starting the engine.
CT02C037
Issued 8-04 Bur
g e a r s
i n
t h e
s e a t
i n
t h e
Figure 1
6-34551NA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx80Cx135sr

Table of Contents