Transport Position For 2.85 M Arm Cx135Sr; Transport Position For 2.85 M (9 Ft. 4 In) Arm Cx135Sr - Case CX75SR Operator's Manual

Hide thumbs Also See for CX75SR:
Table of Contents

Advertisement

Press one of the pedals or one of the levers and,
at the same time, press the other pedal or the
other lever in the same direction, but slightly
harder.
Stopping travel
To come to a complete halt, simply release the
levers or pedals and they will return to neutral.
CS98M545
TRANSPORT POSITION FOR 2.85 M (9
FT. 4 IN) ARM CX135SR
1. Extend the attachment then place the bucket on
the ground.
2. Stop the engine and remove the starter switch
key.
3. Using a suitable lifting device, hold the arm
cylinder.
CT02C200
4. Remove the retaining hardware from the shaft
then drive the shaft out.
5. Start the engine, retract the arm cylinder rod to
bring the cylinder head to the transport position.
6. Stop the engine and remove the starter switch
key.
4-10
CHAPTER 4 - OPERATING INSTRUCTIONS
Figure 21
Figure 22
CT02C201
7. Install the shaft and its retaining hardware,
lubricate the linkage.
CT02C202
IMPORTANT: In this configuration, the working range
of the attachment allows the tool to interfere with the
machine.
When
positioning
transporting, handle with great care.
CT02C203
IMPORTANT: After transporting the machine, the
arm cylinder must be returned to working position.
Issued 8-04 Bur
Figure 23
Figure 24
the
machine
for
Figure 25
6-34551NA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx80Cx135sr

Table of Contents