10. Shut down the engine, remove the starter switch
key, raise the function cancellation lever.
11. Make sure that all doors, hoods and access
panels are correctly locked.
12. Fold the rear view mirrors inwards.
CT02C037
13. Machine with attachment
Use blocks and chains to fasten the machine and
the attachment to the trailer.
14. Machine without attachment
Use blocks and chains to fasten the machine to
the trailer.
PDF0360
15. Machine ready for transport
Measure the distance between the ground and the
highest point of the machine. You must know the
overall height. See Machine overall dimensions in the
Specifications section.
6-34551NA
CHAPTER 4 - OPERATING INSTRUCTIONS
Figure 36
Figure 37
Issued 8-04 Bur
PDH0251
CS99B519

UNLOADING

1. Remove the blocks and fastening chains.
2. Start the engine.
3. Lower the function cancellation lever and raise
the dozer blade (if equipped).
4. Machine with attachment
A. Raise the attachment to bring it a few
centimeters above the trailer bed.
B. Move slowly while raising the attachment so
as to maintain it a few centimeters above the
ground.
5. Machine without attachment
Move the machine slowly.
6. Turn the rear view mirrors back to their correct
position.
WARNING: If the machine is equipped with
the 2.85 m (9ft 4in) arm, for any work with the
machine, the hooking point on the head of the
arm cylinder must be in the work position.
See Putting the 2.85 m (9ft 4in) arm in the