Completing the Installation

3-5-1

Power On / Boot Up

NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-1-1

Scanner Power On

1.) Connect the Power Cable to the back of the system.
2.) Ensure the Cable Clip slips securely over the shoulders on the molded plug.
3.) Connect the Main Power Cable to a hospital grade power receptacle with the proper rated voltage.
Never use an adapter that would defeat the safety ground.
4.) Switch ON the Circuit Breaker at the rear of the system.
a. Circuit Breaker
b. Power Cable
When power is applied to the scanner and the rear Circuit Breaker is turned ON, power is distributed to
the Transformer Assembly and to the TMST.
3-10
PROPRIETARY TO GE
3
EVISION
Section 3-5 - Completing the Installation
VIVID P3 S
M
ERVICE
ANUAL