Completing The Installation; Power On / Boot Up; Power Off/ Shutdown - GE LOGIQ F Series Basic Service Manual

Hide thumbs Also See for LOGIQ F Series:
Table of Contents

Advertisement

GE
D
5273008-100, R
IRECTION
Section 3-5

Completing the Installation

3-5-1

Power On / Boot Up

NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-1-1
Scanner Power On
When power is applied to the scanner, power is distributed to the Cooling Unit, Control Panel, LCD,
Peripherals and the Back-end Processor.
3-5-1-2
Turn on the system
Press the Power On/Off switch at the front of the system once.
When the Power On/Off switch on the Control Panel is pressed once, the Back-end Processor starts
and the software code is distributed to initiate the scanner.
No status messages are displayed during this process.
3-5-2

Power Off/ Shutdown

NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
3-5-2-1
Back-end Processor Power Down
To power down the system:
1.) Press the Power On/Off switch once.
10
EVISION
Figure 3-4 Power On/Off Switch
Chapter 3 System Setup
LOGIQ F SERIES
B
S
M
ASIC
ERVICE
ANUAL
3 - 9

Advertisement