GE Vivid P3 Service Manual page 329

Hide thumbs Also See for Vivid P3:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5344303-100, R
IRECTION
10-7-9-4
Meter Procedure Using Dale Meter to Measure Leakage Current (cont'd)
11.)Set the meter's "FUNCTION" switch to EXTERNAL position.
12.)Add the saline probe and the imaging area of the probe into the saline bath.
13.)Have unit power ON for the first part; turn it OFF for the second half.
14.)Depress the ISO TEST rocker switch and record the highest current reading.
15.)Follow the test conditions described in
16.)Keep a record of the results with other hand copies of PM data.
PROPRIETARY TO GE
3
EVISION
Figure 10-9 Transducer Source Leakage Current Test
Chapter 10 Care & Maintenance
Table 10-24
for every transducer.
VIVID P3 S
M
ERVICE
ANUAL
10-27

Advertisement

Table of Contents
loading

This manual is also suitable for:

53503755350378535037953503805350381

Table of Contents