Overview; Purpose Of Chapter 3; Average Installation Time - GE Vivid P3 Service Manual

Hide thumbs Also See for Vivid P3:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5344303-100, R
IRECTION
Chapter 3
Installation
Section 3-1

Overview

3-1-1

Purpose of Chapter 3

This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
Section
3-1
3-2
3-3
3-4
3-5
3-6
3-6-6
3-7
3-8
3-9
3-10
3-1-2

Average Installation Time

Unpacking the scanner
Scanner /options
DICOM Option
The VIVID P3 installation and functional checkout will take approximately Four hour. VIVID P3 consoles
with optional equipment may take slightly longer.
PROPRIETARY TO GE
3
EVISION
Table 3-1 Contents in Chapter 3
Overview
Receiving and Unpacking the Equipment
Packing the Equipment
Preparing for Installation
Completing the Installation
System Configuration
Software/Option Configuration
Connectivity Installation Worksheet
Loading Base Image Software
Software Version check out
Paperwork
Table 3-2 Average Installation Time
Description
Average Installation Time
Chapter 3 Installation
Description
Approximately 0.5 hour
Approximately 0.5 hour
30 minutes
VIVID P3 S
Page Number
Comments
Dependent on the configuration that is required
Dependent on the amount of configuration
M
ERVICE
ANUAL
3-1
3-3
3-8
3-9
3-10
3-14
3-25
3-26
3-27
3-28
3-29
3-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

53503755350378535037953503805350381

Table of Contents