GE Vivid P3 Service Manual page 94

Hide thumbs Also See for Vivid P3:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5344303-100, R
IRECTION
Section 4-3
General Procedure
SYSTEM REQUIRES ALL COVERS
CAUTION
Operate this unit only when all board covers and frame panels are securely in place. The covers
are required for safe operation, good system performance and cooling purposes.
Lockout/Tagout Requirements (For USA only)
NOTICE
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable on
the system.
TAG
&
LOCKOUT
Signed
Date
4-3-1
Power On/Boot Up
After AC power cable is connected correctly to the transformer & Circiut breaker is switched on, the
power is applied to the scanner & the system is in Stand By mode. In the Control panel Power On/Off
key will be Amber color.
Boot Up
4-3-1-1
In the control Panel press the power On/Off key the led color will turn in Green color & the system will
boot.
A.Circiut breaker
B.Power cable
4-2
PROPRIETARY TO GE
3
EVISION
Figure 4-1 Connect AC adapter
Section 4-3 - General Procedure
V