Kodak X-Omat 270 RA Installation Instructions Manual page 7

Hide thumbs Also See for X-Omat 270 RA:
Table of Contents

Advertisement

[13]
Remove the 2 HEAT EXCHANGER PROTECTORS.
[14]
Remove the packing material from the bottom of the DEVELOPER TANK and FIXER TANK.
[15]
Tighten all adjustable metal band HOSE CLAMPS.
All adjustable metal band HOSE CLAMPS in the PROCESSOR must be checked for tightness
when installing the PROCESSOR. The HOSE CLAMPS may be tight at the factory, but cold
temperatures or shrinkage of the plastic tubing can occur within 2 - 4 weeks.
Figure 3 Removing the Packing Material from the Heat Exchangers
2B6843
IMPORTANT
HEAT EXCHANGER
PROTECTOR (2)
DEVELOPER TANK
FIXER TANK
WASH TANK
HEAT
EXCHANGER
H104_0183DCA
H104_0183DA
7

Advertisement

Table of Contents
loading

Table of Contents