Unitek Miyachi LW250 Operation, Maintenance And Service Manual page 128

Yag laser
Table of Contents

Advertisement

Adjusting the X-Y axes (8-7)
Adjusting the Z-axis (8-5)
Air filter cleaning (7-1)
Aligning the Beam (8-4)
Backup battery replacement (8-12)
Branch unit cover plate (2-10)
Capacitor bank switching (6-5)
Carrying the laser precautions (1-1)
Cautions and warnings indications (1-4)
Cautions page (iv)
CDRH compliance statement (ii)
Cleaning the optics (8-9)
Cleaning the solenoid valve strainer (7-7)
Cleanliness (1-4)
Cold weather operation (1-3)
Contact input signals (3-2)
Contents, table of, manual (v)
Controls and indicators:
External (2-2)
Internal (2-5)
Status panel (2-2)
Cooler maintenance (7-1)
Cooling system:
Air filter cleaning
Components and controls (2-6)
Draining cooling water (7-8)
Filter replacement (7-1)
Flow rate controller replacement
(7-8)
990-605 REV B: May, 1997
-A-
-B-
-C-
LW250 PULSED N:d YAG LASER
ALPHABETICAL SUBJECT INDEX
-C- (continued)
Cooling system (continued):
Ion exchange resin cartridge
replacement (7-2)
Preparation (5-2)
Replacing D.I. water (7-2)(7-4)(7-5)
Solenoid valve strainer cleaning
(7-7)
Cooling water draining (7-6)
Data communications (B-1)
Display screens:
Maintenance (2-12)
Monitor (2-14)
Schedule/monitor (2-11)
Status (2-13)
D.I. water supply:
Replacing (7-2)(7-4)(7-5)
Replenishing (5-2)
Draining cooling water (7-6)
Electrical supply precautions (1-1)
External communications interface
specifications (B-1)
External controls and indicators (2-2)
External panels (2-8)
External start signals (3-6)
Features of system (2-1)
-D-
-E-
-F-
INDEX-2

Advertisement

Table of Contents
loading

Related Products for Unitek Miyachi LW250

Table of Contents