FORM 160.72-O1 (810)
The following instructions outline the procedures to be
followed for the operation of the YORK OM Titan™
retrofitted with OptiView Controls.
After the installation and during the Initial Start-Up, the
Johnson Controls Start-Up Engineer will instruct the
operators in the operation and necessary maintenance
to be performed to maintain the YORK OM Titan™
retrofitted with OptiView Controls. This instruction
should be thoroughly read by the operators to familiar-
ize themselves with the operation of the unit.
It is important that those responsible for the installation,
operation and maintenance of this system be provided
with a copy of this manual so that they may thoroughly
study its contents. This will help ensure successful op-
eration of the system.
JOHNSON CONTROLS

seCTion 1 - inTroduCTion

Standard Johnson Controls operating instructions are
included in this manual. Where the specific instruction
is different than the standard instructions, the specific
instruction should be followed. On matters not covered
by the specific instruction, the standard instruction
may be used.
It is suggested that a factory-trained representative of
Johnson Controls supervise any major service or main-
tenance operation. This is especially recommended
should it be necessary to open the compressor or heat
exchangers for any reason.
To obtain a service representative contact:
Your local Johnson Controls Service office at
1-800/524-1330.