M2600A Telemetry System - When To Perform Test Blocks - Philips TeleMon B M2636B Service Manual

Table of Contents

Advertisement

M2600A Telemetry System - When to Perform Test Blocks

M2600A Telemetry System - When to Perform Test Blocks
Service Event
When performing.....
of M2636B.
Installation
Repairs
affecting the power supply assembly
(excluding battery).
Repairs where the monitor has been dropped.
Repairs where NBP or main processor board have
been replaced.
All other repairs, hardware or software upgrades.
Upgrade to hardware.
Upgrade to software.
Preventive Maintenance.
6-8
Test and Inspection Matrix
Test Block(s) Required
Complete these tests
Perform Visual, Power On test block.
Perform Power On and Safety (2) test blocks.
Perform Power On and Safety (2) and (3) test blocks.
Calibrate NBP and perform Power On test block.
Perform Power On test block.
Perform Power On test block.
Perform Power On test block and check revision code for
correct load.
Perform all Performance test blocks.

Advertisement

Table of Contents
loading

Table of Contents