Download Print this page

J&M Nitro Gro 5010 Assembly Manual page 27

Hide thumbs Also See for Nitro Gro 5010:

Advertisement

5. Mount the 4' x 8" hydraulic cylinders under the toolbar frame as shown below. Secure the cylinders with 1" x
3-3/8" pins.
6. Connect the hoses from the top two ports of the valve bank on the main frame to the 4" x 8" hydraulic lift
cylinders. These hoses will be labeled in yellow.
7. Connect the hoses from the bottom two ports of the valve bank on the main frame to the 4" x 24" hydraulic
fold cylinders. These hoses will be labeled in red.
8. Set down pressure gauge at 650psi and test hydraulic functions.
Connecting Frame and Coulters to Toolbar
27

Advertisement

loading