Machine

Visual and function check of the machine

3
Machine
3.1 Visual and function check of the machine
Personnel
The machine operator
Painted surfaces
18
Interval
Every 10 OH / daily
Once every 250 OH / approx. 4-6 weeks after commissioning
In order to ensure the operating safety of the machine, the operator
must carry out a daily visual and function check of the machine.
Alongside general damage and possible leakage, safety-relevant
bolts, screw connections, the rope, and the cylinder are to be
checked in particular.
Paint damage can be caused by external factors or cracks and
deformations in the steel structure.
Protective equipment:
Park the machine.
1.
Secure the machine against being restarted without authori-
2.
zation.
Inspect all accessible painted surfaces for damage.
3.
Preliminary
GHC75 Telescopic crane
Protective clothing
n
Protective gloves
n
Safety shoes
n
Hard hat
n
Crane Care
21.12.2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GHC75 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents