Rope

Lubricate rope

Test criteria for wire rope check
Test criteria
When rolling the wire
n
rope out and up, check
the rope mobility and
winding on the rope
drum.
Check the rope guide
n
components for mechan-
ical damage.
Check the rope drum for
n
traces of wear.
Check if rope protection
n
has been attached as per
the manufacturer's
instructions.
If necessary, untwist the
n
wire rope when rolling out
and up.
Check the wire rope for
n
wear and damage.
Check the wire rope for:
n
malformations
protruding wires
main strand exten-
sions
Corrosion
broken or cut strands
the effects of heat
reduction of the rope
diameter during oper-
ating time
9.2 Lubricate rope
Personnel
Service Technician
The machine operator
88
Component
Wire rope
n
Guide rollers
n
Fixed rope guide compo-
n
nents
Rope drum
n
Wire rope clamps
n
Wedging clamps
n
Pouch sockets
n
etc.
n
Wire rope
n
Wire rope
n
Wire rope
n
Interval
Every 500 OH
Once every 250 OH / approx. 4-6 weeks after commissioning
Preliminary
GHC75 Telescopic crane
Comment
For examination procedure, see section
n
Supplemental documentation.
Display the test results.
n
Use the nominal sizes suitable for the
n
rope diameter with all detachable compo-
nents.
When using pouch sockets make sure
n
that, after the insertion of the rope end
connection, that the connection is
secured against slipping out.
Wire rope clamps are not permissible as
n
end fittings for running wire ropes and for
repeated loads.
For untwisting, see section Supplemental
n
documentation.
Display the test results.
n
Display the test results.
n
Crane Care
21.12.2017

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GHC75 and is the answer not in the manual?

Table of Contents