Manitowoc Grove GMK 5250L Operating Instructions Manual page 712

Hide thumbs Also See for Grove GMK 5250L:
Table of Contents

Advertisement

Rigging work
11.1 Rigging work checklists for crane operation with the main boom
11 - 4
15. Install the lifting limit switch;
16. Install anemometer, air traffic control light and camera on main boom;
à
Anemometer and air traffic control light , p. 11 - 126,
à
Camera on main boom , p. 11 - 137.
17. Perform all the required checks prior to crane operation;
à
CHECKLIST: Checks before operating the crane , p. 10 - 1.
18. Enter and confirm the current rigging mode;
19. With the RCL adjusted accordingly, rig the counterweight combination
required for the operation according to Lifting capacity table ;
à
CHECKLIST: Rigging the counterweight , p. 11 - 74.
20. If required, mount the auxiliary hoist;
auxiliary hoist , p. 6 - 55.
21. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à
p. 11 - 120.
à
p. 10 - 32.
3 302 633 en
à
p. 10 - 32.
à
CHECKLIST: Installing the
Operating Instructions GMK5250L

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK 5250L and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF