Rigging for crane
operation
Operating Instructions GMK5250L
Slacken the hoist rope and raise the main
boom simultaneously.
Raise the main boom until the boom head
is in a vertical position above the block
hook (1).
Detach the block hook from the retaining
ropes (2).
(A) – Pull the pin (3) out.
(B) – Raise the hook block (1) above the
hook (2) until the connecting points are
aligned.
Insert the pins (3) and secure them with the
retaining pins.