Kessel Ecolift 21071 Installation And Operating Manual page 17

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13
Using 3 or more
extension sections
does not allow pro-
per access to the
valve for service or
repair and is not
recommended.
3.3 Ventilation
The Ecolift come equipped with a ventilation
connection
valve and an activated charcoal filter. As an al-
ternative a ventilation pipe can be connected to
the Ecolift in accordance with the norm. In this
case the ventilation valve can be removed and
the ½ inch threaded connection can be atta-
ched directly to the ventilation pipe (which
should be run to ambient air – roof connection).
3.4 Installation in high groundwater / earth
moisture areas
In the case that the Staufix FKA® for con-
)
crete slab installation is to be installed in a
floor slab which will be protected against gro-
undwater or earth moisture – sealing gasket
set 83023 must be used (accessory). If the
concrete slab will be equipped with a mem-
brane or sheet – this sheet is to be connec-
ted to the Staufix FKA® body with the coun-
ter flange supplied with the 83023. In the
case that a water proof concrete is being
used then the heavy duty Kautschuk seal (in-
cluded with the 83023) is inserted and then
fixed tight with the counter flange. Please in-
stall the Kautschuk flange properly so that
the pre-drillled holes in the Kautschuk seal
match up with the screw holes of the coun-
ter flange. (see illustration 7). In the case that
the water tight slab barrier is penetrated by
drainage pipes or conduit pipes to the SWA,
it should be assured that these penetrations
nstallation example "black tub"
BWS
*
4
➀ KESSEL-Ecolift, Staufix FKA , Staufix SWA, Controlfix
➁ Groundwater protection set 83023
➂ Extension section (Article Number 83071)
➃ DN 100 intermediate section with stainless steel counter flange
(Article Number 27198)
3. Installation
are also water / moisture tight.
The maximum groundwater resistance of the
Staufix backwater valve for concrete slab in-
stallation is 2 meters.
Installation with extension (order no.
83071).
Use of the extension allows the flange
height to be individually adjusted. The
attachment must be shortened to the re-
quired height if necessary.
colift advantage
3.6
The Ecolift is equipped with an integrated
odour free floor drain for the drainage of
floor / basement water.
The connection of the integrated floor drain
Installation
3.6
requires the connection of the included in-
terior connection pipe. Place the connec-
tion pipe into the appropriate opening and
connected with the red finger clamp. In the
case that the installation depth of the Eco-
lift has been changed due to installation re-
quirements, the internal floor drain connec-
tion may need to be adjusted to meet the
appropriate height (see illustration 8). If an
ischarge line
Tiles
Screed
Fliesen
Insulation
Estrich
Concrete slab
Dämmung
Protective concrete
Betonboden
Moist. protect. sheet
Schutzbeton
sub slab
Abdichtung
Unterbeton
2
3
1
extension section (Article Number 83071)
was used to increase the installation depth
of the Ecolift then a DN 70 HT-pipe may be
used to extend the installation depth of the
floor drain connection pipe.
*
Fig. 8
nstallation example "white tub"
BWS *
4
5
➄ DN 100 intermediate section with stainless steel counter flange
(Article Number 27198)
➅ Upper section with plastic cover
➆ Control unit
➇ Emergency manual flap closer lever
17
Seal seat (83023)
• Counterflange • Sealing sheet
compression seal flange
Fig. 7
S
Ecolift
Fig. 9
Tiles
Screed
Fliesen
Insulation
Estrich
Concrete slab
Dämmung
Betonboden
2
WU-Beton
1
Discharge
line DA 40
ischarge line
Fig. 10