Installation
7.7
Connection box
If more controllers are to be connected, a connection box must be fitted.
1. Install the connection box in an appropriate location.
2. When fitting, the drainage tube must be facing downwards, see Fig 44.
3. Connect the controllers to the connection box and the connection box to the relay board, see "8.1 ZHZ-
600-850 MAConnection to circuit board" on page 64 and "8.2 Connection to circuit board 4 – button
operation" on page 65.
www.zepro.com
Connection box
Drainage tube
Fig 44. Connection box
Circuit board
Cover
55