8. Commissioning Protocol for installation company

Handover certificate (copy for the company carrying out the installation)
The initial operation and instruction was carried out in the presence of the person authorised to perform the accep-
tance and the system operator.
The system operator/person authorised to perform the acceptance was informed about the obligation to service the
product according to the enclosed operating instructions.
Initial operation and instruction were not carried out.
The client/ person responsible for initial operation was handed the following components and/or product components
Initial operation and instruction is being carried out by (company, address, contact, phone)
The exact coordination of the dates for initial operation/instruction is being carried out by the system operator and person re-
sponsible for initial operation.
Place, date
Signature of person
authorised to perform acceptance
Signature of system operator
29
Signature of the company
carrying out the installation work