Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
5

Commissioning

The control unit performs the following additional functions automatically:
Checking the battery voltage
The control unit checks the battery voltage 2x daily and signals a battery error (potential-free contact "fault") if the voltage
falls below a certain level. Optical and acoustic warning signals appear on the control unit every 20 seconds.
SDS Self diagnosis system
The control unit has an automatic self-check, which performs a functional check of the connected components automatically.
Preset test cycle:
every 28 days (freely adjustable)
5.1
Switch on
Open housing (anticlockwise).
Connect battery(ies).
Close housing (clockwise).
Connect to the mains.
0 System info|
Check whether the |
This indicates a successful system test. If the
tem info|
menu does not appear, initialise as
described below.
Green LED indicates standby state (ready for operation).
5.2
Carrying out initialisation
During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|
|Maintenance interval|
Language
► Press OK.
► Use the cursor keys to select the language and confirm
with OK.
|Date/Time|
Menu
appears.
Date / Time
► Set the respective flashing figure in date and time and
confirm with OK.
|Product type|
Menu
Product type
► Select product type and confirm with OK.
Selection affects which setting options are available.
|Maintenance interval|
Menu
Maintenance interval
► Enter the maintenance interval specified in the standard.
Initialisation is completed, control unit is ready for use.
The first time pressing of the OK button activates control
mode at the control unit. (The display lights up).
010-910
menu appears.
|0 Sys-
appears.
appears.
Fig. 3: Navigating in the menu
(1)
Confirm by pressing "OK"
(2)
Scroll down
(3)
"ESC" - back
(4)
Scroll up
33 / 120

Advertisement

Table of Contents
loading

This manual is also suitable for:

Comfort 230v duo

Table of Contents