The following steps outline the initial set-up of your Pump Stand:
1. Clear the area of bystanders, especially small children, before moving.
2. Be sure there is enough clearance from overhead obstructions and power lines or
other equipment to move the pump stand(s) into its working position.
3. Using a forklift, place the pump stand in the desired position on a level surface.
USC highly recommends that the pump stand be set up inside
NOTICE
a building or any covered structure to protect the machine from
weathering.
4. Inspect machine thoroughly for screws, bolts, fittings, etc. which may have come
loose during shipping.
5. Anchor to the floor with the floor mount type stand.
6. The pump stand(s) should be placed on level ground close to the seed treater.
7. Attach the chemical tubing from the pump stand(s) to the atomizer plumbing on
the seed treater (below). Additional tubing can be added or removed to
accommodate your set-up. (see page 14)
8. Have a certified electrician provide power to the seed treating system.
Provide convenient shutdown switches, comply with local electrical codes and
ensure that the system is properly grounded and bonded. The USC system must
be connected to the same electrical requirements as specified in the main control
panel on the power requirement tag, or the electrical schematic shipped with the
piece of equipment.
PUMP STANDS PS10
HIGH VOLTAGE ~ Always disconnect the power source
fore working on or near the control panel or lead wires.
HIGH VOLTAGE ~ Use insulated tools when making
adjustments while the controls are under power.
Permanent installation may require additional electrical cords,
chemical tubing, and air lines, since each installation is unique.