1.5.2 INSTALLATION CHECKLIST

All packing materials and restraints have been removed from each cabinet.
Each cabinet in the UPS system is placed in the installed location.
All conduits and cables are properly routed to the UPS and auxiliary cabinets.
All power cables are properly sized and terminated.
A ground conductor is properly installed.
Battery cabinet installation instructions have been completed.
Air conditioning equipment is installed and operating properly.
The area around the installed UPS system is clean and dust-free.
Adequate workspace exists around the UPS and other cabinets.
Adequate lighting is provided around all UPS equipment.
Any optional accessories are mounted in their installed location and properly wired.
Summary alarms and/or building alarms are wired appropriately. (OPTIONAL)
Start-up and operational checks performed by certified service personnel.
All network connections are completed.
04-3004_S1_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc
Printed in Switzerland – Modifications reserved
Section-1
Page 20/20 ABB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerscale cabinet bPowerscale cabinet c

Table of Contents