Operation; Commissioning; Control Panel; Power Management Display (Pmd) - ABB PowerScale CABINET A User Manual

Table of Contents

Advertisement

4.1

OPERATION

4.1.1

COMMISSIONING

The PowerScale is a high quality electronic machine, that must be commissioned by a fully trained and certified
field service engineer before being put into use.
The commissioning of the UPS involves the connection of the UPS and battery, the checking of the electrical
installation and operating environment of the UPS, the controlled start-up and testing of the UPS and customer
training.
WARNING!
4.1.2

CONTROL PANEL

WARNING!
The user-friendly control panel is composed of three parts:
POWER MANAGEMENT LCD DISPLAY (PMD);
LED INDICATORS;
KEYS.
Figure 1.1 Control Panel

4.1.2.1 Power Management Display (PMD)

The 2 x 20 character LCD simplifies the communication with the UPS and provides the necessary monitoring
information about the UPS. The menu driven LCD enables the access to the:
EVENT REGISTER;
Monitor the input and output U, I, f, P,
Battery runtime;
To perform commands like start-up and shut-down of UPS and
Load transfer from INVERTER to BYPASS and vice-versa;
OPERATIONS INSIDE THE UPS MUST BE PERFORMED BY A SERVICE
ENGINEER FROM THE MANUFACTURER OR FROM AN AGENT CERTIFIED BY
THE MANUFACTURER.
ONLY PERSONS WHICH HAVE BEEN TRAINED BY SERVICE TECHNICIANS OF
THE MANUFACTURER OR HIS CERTIFIED SERVICE PARTNERS ARE ALLOWED
TO OPERATE ON THE CONTROL PANEL WITH CLOSED DOORS.
ALL OTHER INTERVENTIONS ON THE UPS SYSTEM HAVE TO BE DONE ONLY
BY SERVICE TECHNICIANS OF THE MANUFACTURER OR FROM AN AGENT
CERTIFIED BY THE MANUFACTURER.
04-3004_S4_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc
Printed in Switzerland – Modifications reserved
Section-4
Page 2/8 ABB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerscale cabinet bPowerscale cabinet c

Table of Contents