3.8 Installation Checklist

All packing materials and restraints have been removed
from all modules.
Each unit in the UPS system is placed in the installed
location.
All conduits and cables are properly routed to the UPS and
auxiliary cabinets.
All power cables are properly sized and terminated.
A ground conductor is properly installed.
Battery enclosure is installed.
Air conditioning equipment is installed and operating
correctly.
The area around the installed UPS system is clean and
dust-free.
Adequate workspace exists around the UPS and other
cabinets.
Adequate lighting is provided around all UPS equipment.
Any optional accessories are mounted in their installed
location and properly wired.
Start-up and operational checks have been performed by
authorized service personnel.
All network connections are completed.
24 PowerValue 11 RT 6-10kVA | User manual