Checklist Frequency Inverter Wide And High Speedlane 900 - BOON EDAM Speedlane 900 Operation Installation And Maintenance

Table of Contents

Advertisement

16.2.1 Checklist Frequency Inverter Wide and High Speedlane 900

Project number :
Door number:
ParameterParameter
No.
Description
Pr.00
Start up boost
Pr.01
Maximum speed
Pr.02
Minimum speed
Pr.03
Voltage Pr.19 by Freq.
Pr.07
Acceleration time
Pr.08
Deceleration time
Pr.09
Max premisable Curr.
Pr.10
Freq. DC braking
Pr.11
DC braking time
Pr.12
DC per. of Voltage
Pr.17
MRS input selection
Pr.19
Voltage by Freq Pr.3
Pr.72
PWM frequency
Pr.73
Input selection
Pr.77
Parameter write sel.
Pr.117
PU comm. station nr.
Pr.122
PU comm. check time
Pr.125
Terminal 2 gain
Pr.160
Extended func. Dis.
* Setting range Pr.19 is between 70 and 80 V
Permissible dyn. force:
Measured dyn. force:
Inominal:
A Max.: 0.3A
Page:
73
Version:
2014/11
Edition:
SL900 -OIM - USA
Checklist Frequency Inverter Speedlane - SL Wide
Date :
Engineer :
Default
BEBV
On-site Parameter Parameter
setting setting setting No.
%
6
30
Hz.
120
80
Hz.
0
5
Hz.
50
26
sec.
5.0
0.0
sec.
5.0
0.0
A
3.4
0.0
Hz.
3
sec.
0.5
0.0
%
4
0
2
V
8888
75
*
1
15
1
0
0
2
0
25
sec.
0
9999
Hz.
50
100
9999
0
<200mm
400 N
50mm
N
Istart:
Description
300mm
700 N
300mm
N
A Max.: 0.8A
FR-D720S-025-EC
Default
BEBV
On-site
setting setting
setting
>500mm
1400 N
500mm
N
OIM - Manual
Speedlane 900

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents