Maintenance; General; Electrical; Mechanical - BOON EDAM Speedlane 900 Operation Installation And Maintenance

Table of Contents

Advertisement

MAINTENANCE

13 Maintenance
For detailed troubleshooting information please refer to chapter 14 Troubleshooting.

13.1 General

The technician should report to a contact or to the reception desk and should always ask if
there are any particulars.
Make sure to write down any remarks made by the customer on the checklist.
Perform a visual check for broken glass (sharp edges) or other damages.
Check the whole unit for unusual noises.
Check the details of the location on the maintenance checklist (product type, product no.).
In case of malfunctions events can be viewed using in the error state.
Remove the top plate and side cover to get access to the drive system and electronics.
Check out with contact and/or at reception desk.

13.2 Electrical

Check the safety functions.
Perform a function test, control panel functions.
Check the operation of the sensors.
Check earth screen and earth leads.
Check the electrical wiring, especially for damages near moving parts.
Check the motor unit and brake.

13.3 Mechanical

Check the floor mountings and fasten where needed.
Check the motor mountings and fasten where needed.
Check the whole installation for correct alignment with floor (surroundings).
Page:
63
Version:
2014/11
Edition:
SL900 -OIM - USA
OIM - Manual
Speedlane 900

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents