5.2.4 Conduit layout

Typical conduit layout for a Speedlane utilizes five conduits for a single lane.
Always refer to site specific drawings for correct detail and number of conduits.
For the Speedlane:
3 x 1 3/4" conduits connecting each Master and Slave unit. This is for running the wiring for
the sensors, motors, and LED displays.
Additionally, you will need the following conduits:
1 x Conduit to the ACS system.
- This is for the card readers, alarm interfacing, and lane control.
1 x Conduit to the Fire Alarm system.
1 x Conduit for Mains Power supply.
Page:
24
Version:
2014/11
Edition:
SL900 -OIM - USA
Secure Side
(Exit)
Non-Secure Side
(Entry)
Typical Conduit Layout
9 7/16"
(240mm)
5 1/2"
(140mm)