2-Post Rack Mounting - Oracle Talari E1000 Installation Manual

Hide thumbs Also See for Talari E1000:
Table of Contents

Advertisement

2-Post Rack Mounting

Layout & Required Components:
 2x Front Outer Rails
 2x Pre-Threaded (10-32) Brackets for 2-Post Racks
O R
 2x Front Outer Rails
 2x Non-Threaded Brackets for 2-Post Racks (For use with your own cage nuts and rack screws)
Assembly
5. Attach 1 selected mounting bracket to the raised oblong middle section of one of the Front Outer Rails with a short rounded
screw (contained in rack mounting hardware bag). Ensure that the Front arrow on the bracket points towards the front of the
rail. a. Note: The word "Limit" on the Front Outer Rail should still be visible once the bracket is joined to the Front Outer Rail.
6. Repeat with second Front Outer Rail.
Version 1.1
1 2

Advertisement

Table of Contents
loading

Table of Contents