Oracle Talari E1000 Installation Manual page 18

Hide thumbs Also See for Talari E1000:
Table of Contents

Advertisement

E1000 with Fail-to-Wire Expansion Card:
Port 9: Gigabit Ethernet (Bypass pair with Port 10)
Port 10: Gigabit Ethernet (Bypass pair with Port 9)
Port 11: Gigabit Ethernet (Bypass pair with Port 12)
Port 12: Gigabit Ethernet (Bypass pair with Port 11)
Note: Ports 9 and 10 may be configured in either Bypass Mode on an E1000 with Fail-to-Wire expansion card, as may ports 11 and 12.
st
Easy 1
Install Site Deployment Criteria:
NCN:
 Easy 1
st
Install can be used once the Network Control Node (NCN) has been set up for your network. If the E1000 being
deployed is intended to become the NCN, please see the instructions for manual installation.
 Active Appliance Package: The NCN must be running an active configuration which includes the E1000 for the site
being installed.
Client Site Connectivity:
 Internet, DHCP, and DNS connectivity to the management interface are required to use Easy 1
available, please see the instructions for manual installation. If the management interface is connected to the LAN segment,
communication with the public Internet will be blocked and Easy 1
 Cable the LAN and WAN ports in accordance with the Talari configuration for the site.
Use NCN to Upload Client Package to Registration Server:
11. Log in to the Web Console of the NCN.
12. Navigate to Manage Network > Appliance Installation.
Version 1.1
Port 9 Port 10 Port 11 Port 12
st
Install will fail.
st
Install. If one or more are not
1 7

Advertisement

Table of Contents
loading

Table of Contents