Oracle Talari E1000 Installation Manual page 22

Hide thumbs Also See for Talari E1000:
Table of Contents

Advertisement

E1000 with Fail-to-Wire Expansion Card:
Port 9: Gigabit Ethernet (Bypass pair with Port 10)
Port 10: Gigabit Ethernet (Bypass pair with Port 9)
Port 11: Gigabit Ethernet (Bypass pair with Port 12)
Port 12: Gigabit Ethernet (Bypass pair with Port 11)
Note: Ports 9 and 10 may be configured in either Bypass Mode on an E1000 with Fail-to-Wire expansion card, as may ports 11 and 12.
Manual Install Site Deployment Criteria:
Manual (Legacy) Install requires physical access to the appliance. The end user will require a PC which can be connected directly to
the AUX port of the Talari Appliance via an Ethernet cable.
Cable the LAN and WAN ports in accordance with the Talari configuration for the site.
Pre-Deployment Requirements:
The network administrator must have an active configuration which includes a client package for this site running on the NCN. An
appropriate IP address, subnet mask, and gateway for the management interface should be provided for the on-site user to configure.
If the network administrator will have access to the new appliance once an on-site user configures the management interface, proceed
to step 4 of Deploying the Talari Appliance. If not, the on-site user will require the client package from the running configuration:
21. From the Web Console of the NCN, navigate to Manage Network > Change Management.
22. Download the active package for the new client site.
23. Send the zipped client package to the on-site user who will be deploying the appliance.
Deploying the Talari Appliance:
1. Connect the power cord to the E1000. Connect the other end to an appropriately grounded power source. The E1000 will power
on automatically.
Version 1.1
Port 9 Port 10 Port 11 Port 12
2 1

Advertisement

Table of Contents
loading

Table of Contents