Installing The Apn Appliance; Rack Installation; Lan/Wan Connections; Connecting Power To The Appliance - Oracle Talari T860 Hardware Manual

Table of Contents

Advertisement

Oracle Talari T860 Hardware Guide

Installing the APN Appliance

Rack Installation

Prior to installing the system in a rack, adhere to the following rack installation guidelines:
 Ensure that there is adequate airflow in the rack. Improper installation or
restricted airflow can damage the equipment.
 You should leave at least 1U of vertical space between each system you install in a rack.
 The rack width and depth must allow for proper serviceability and cable management.
 Make sure the rack is properly secured to the floor or ceiling and grounded.
 Always load the rack from the bottom up.
 Load the heaviest component in the rack first.
 Make sure the rack is level and stable before pulling a component out of the rack.
 Do not move racks by yourself; at least two people are needed to move a rack
and to safely stage equipment.
 Cables should be easily identifiable

LAN/WAN Connections

When connecting each Ethernet cable (LAN, WAN) to the appropriate connector on the
T860 APNA:
 Position the cables carefully, so that they do not put strain on the connectors.
 Organize cables in bundles such that cables do not intertwine.
 Inspect the cables to make sure that the routing and bend radii are
satisfactory. Reposition cables, if necessary.
 Install cable ties in accordance with site requirements.

Connecting Power to the Appliance

When connecting power to the T860 APNA:
 Make sure the system is powered off using the power button on the front of
the appliance.
 Plug the AC power cord into the appliance.
 Plug the AC power cord into an uninterrupted AC power source.
The T860 APNA uses 120-240 V AC.
.