Oracle Talari E1000 Installation Manual page 14

Hide thumbs Also See for Talari E1000:
Table of Contents

Advertisement

Installation
7. Facing front of rack, install each assembled Front Outer Rail (with joined bracket) to the two post rack using rack screws
(not provided).
8. Slide the E1000 onto the rail arms until you hear the click from the Side Rail Locks on the E1000 indicating proper installation.
Removal
9. Pull side of device towards the front of the rack until the E1000 Side Rail Locks are exposed.
10. Depress the Side Rail Locks on both sides of the E1000 simultaneously and then continue to pull device forward until released
from rails.
Version 1.1
Figure 6: Side View of E1000 Showing Side Rail Locks
13

Advertisement

Table of Contents
loading

Table of Contents