Fill Flow Meter - 70 Series - Goldacres Prairie Pro Operator's Manual

Table of Contents

Advertisement

erie
Fill Flow Meter
e Feat re
The Tee Jet monitor and flow meter system can be set up to measure the amount of flow entering the main
spray system or it can be set up with a supplementary electronic ball valve that will shut off when a pre
determined volume is reached preventing over filling of the sprayer.
When the flow meter system is connected without the ball valve the flow meter is not re uired to be turned
on to fill the tank. owever when the electronic ball valve is part of the system the console must be powered
on and the target volume must be set to open the ball valve and allow li uid to flow through and fill the tank. If
this is not done the ball valve will remain closed, blocking flow to the main tank and dead heading the fill pump.
The console can be programmed to reset to the maximum tank volume every time the filling process is
activated. If a lesser amount is re uired then the maximum volume can be reduced to the re uired amount.
When this amount is reached an alarm will sound. If the system has a ball valve, the valve will shut off stopping
flow to the main tank. If the valve is not fitted the CLR button can be pressed to silence the alarm.
Operation
tton F n tion
ON
CL AR
tart
p
SO TWAR
RSION
Prairie Pro Operator's Manual MY19 - REV 2
ll ow
eter
reen
erie
INCR AS
PR SS
TO
T
R TO
T RN O
CR AS
Continued over page
Chapter 12 - Optional Accessories - 141

Advertisement

Table of Contents
loading

Table of Contents