Maintenance; Maintenance Schedule - Honeywell HON R100NG Series User And Maintenance Manual

Gas pressure regulator with pilot
Table of Contents

Advertisement

8
Maintenance 
Contents 
8.1
Maintenance schedule 
Meaning 
Maintenance schedule 
 
User manual for HON R100 gas pressure regulator with HON P095NG pilot 
 
Topic 
Maintenance schedule 
Preparing for the maintenance 
Starting maintenance 
Maintaining the actuator assembly 
Maintaining the pilot 
Completing the maintenance 
 
The maintenance schedule provides an overview of the periodically required maintenance 
and repairs and makes reference to the appropriate instructions. 
Note: The maintenance intervals specified below are recommendations only. Since the 
intervals for maintenance work depend heavily on the system's operating conditions and on 
the gas' properties, the maintenance intervals specified below may have to be adjusted as 
necessary.   
Gas property specifications: Technical specifications (see page 17). 
 
Perform the following maintenance and repairs within the specified time intervals: 
 
Task 
Maintaining the actuator 
assembly 
Maintaining the pilot 
Setting the target pressure 
 
 
See section 
Maintaining the actuator assembly 
(see page 50) 
Maintaining the pilot (see page 62) 
Setting the target pressure (see 
page 40) 
 
 
Maintenance 
Page
44
44
45
50
62
76
Interval 
 
 
 
 
 
 
 
 
 
 
 
 
44 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon p095ng seriesHon r100ngHon r100ng-foHon p095ng-mpHon p095ng-hp

Table of Contents