Maintenance; Maintenance Schedule - Honeywell HON 380 User And Maintenance Instructions

Gas pressure regulator with controller
Table of Contents

Advertisement

8

Maintenance

Contents

8.1 Maintenance schedule

Meaning
Maintenance
schedule
HON 380 gas pressure regulator with HON 673/674 controller
Topic
Maintenance schedule
Preparing for the maintenance
Starting maintenance
Removing the regulator unit
Dismounting the controller
Performing maintenance on regulator unit
Installing the regulator unit
Maintaining the monitoring device
Installing the controller
Completing the maintenance
The maintenance schedule provides an overview of the periodically required
maintenance and repairs and makes reference to the appropriate instructions.
Note: The maintenance intervals specified below are recommendations only.
Since the intervals for maintenance work depend heavily on the system's operat-
ing conditions and on the gas' properties, the maintenance intervals specified be-
low may have to be adjusted based on the relevant operating requirements and
experience. Maintenance must be carried out in compliance with all federal and
state laws and regulations, as well as with the local rules and regulations set forth
by the relevant utilities and authorities and any other applicable regulations.
Perform the following maintenance and repairs within the specified time intervals:
Task
Performing maintenance
on regulator unit
Maintaining the monito-
ring device
See section
Performing maintenance on
regulator unit (see page 47)
Perform maintenance on the
controller; see component doc-
umentation included in delivery
Maintenance
Page
39
40
41
43
45
47
61
62
62
63
Interval
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon 673Hon 674

Table of Contents