Honeywell HON R100NG Series User And Maintenance Manual page 33

Gas pressure regulator with pilot
Table of Contents

Advertisement

Preparing for transporta‐
tion 
Transporting the device 
 
User manual for HON R100 gas pressure regulator with HON P095NG pilot 
Make sure that the following requirements are met before transportation: 
 You have seen and taken into account all instructions on the packaging regarding the 
orientation of the packed device, the center of gravity, and attachment points. 
 The transport route is clear of obstacles and other barriers, and there is enough space 
available for the dimensions of the packed device and the handling equipment. Make 
sure to measure all of the package's dimensions! 
 The transport route will be able to handle the load exerted by the total weight of the 
handling equipment and the load being transported. 
 There is enough space for unpacking and installing the device at the installation loca‐
tion. 
 
Proceed as follows: 
Figure 
 
Transport, installation and start‐up 
Step 
Description 
Leave the transport panels (1) on the gas 
pressure regulator during transport. 
Rig the sling to the eye bolt (1). 
Lift the gas pressure regulator. 
Slowly and carefully transport the gas 
pressure regulator to the location where it 
will be installed. 
 
 
33 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon p095ng seriesHon r100ngHon r100ng-foHon p095ng-mpHon p095ng-hp

Table of Contents