Honeywell HON R100NG Series User And Maintenance Manual page 37

Gas pressure regulator with pilot
Table of Contents

Advertisement

Test configuration 
Checking the system for 
leaks 
 
User manual for HON R100 gas pressure regulator with HON P095NG pilot 
The test configuration is as follows (concept sketch): 
The numbers have the following meaning: 
No. 
Meaning 
Inlet chamber 
Outlet chamber 
Inlet stop valve armature 
Gas pressure regulator 
Blowdown line shut‐off device 
Outlet stop valve armature 
 
Proceed as follows: 
Step 
Description 
Slowly close the outlet stop valve armature. 
Apply the test medium to all detachable pipe joints. 
Observe the test medium on all detachable pipe joints for several minutes. 
 
If ... 
no foam or bubbles are formed, 
Foam or bubbles are formed, 
 
Step 
Description 
Slowly close the inlet stop valve armature. 
Depressurize the inlet chamber and the outlet chamber. 
Seal the leaking pipe joints. 
Repeat the leak test starting with step 1. 
 
Transport, installation and start‐up 
then ... 
 the system is leak‐proof. 
 the system may be put into operation. 
 the affected pipe joint is leaking. 
 the system may not be put into operation. 
 Proceed with step 4. 
 
 
 
37 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon p095ng seriesHon r100ngHon r100ng-foHon p095ng-mpHon p095ng-hp

Table of Contents