Honeywell HON R100NG Series User And Maintenance Manual page 46

Gas pressure regulator with pilot
Table of Contents

Advertisement

Overview 
Establishing the depres‐
surized status 
Purging the lines with 
nitrogen 
User manual for HON R100 gas pressure regulator with HON P095NG pilot 
Schematic diagram: 
The numbers have the following meaning: 
No. 
Meaning 
Inlet stop valve armature 
Inlet pressure gauge 
Gas pressure regulator 
Loading pressure gauge 
Blowdown line shut‐off device 
Outlet pressure gauge 
Outlet stop valve armature 
 
Proceed as follows: 
Step 
Description 
Close the inlet valve (1). 
Close the outlet valve (7). 
Depressurize the pilot.   
Turn the set screw on the pilot clockwise until the pressure in the regulator is equalized. 
Open the blowdown line's (5) shut‐off device to discharge the pressure between the inlet 
and the outlet. 
 
All the gas pressure regulator's lines must be purged with nitrogen before the device is re‐
moved. 
 
 
Maintenance 
 
46 

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon p095ng seriesHon r100ngHon r100ng-foHon p095ng-mpHon p095ng-hp

Table of Contents